Vaasa Central Hospital
1991 · public hospital in Vaasa, Finland
Vaasa Central Hospital is a public hospital in the city of Vaasa, on Finland's west coast. It runs an emergency department, an intensive care unit, a maternity ward, a paediatric clinic and several other specialist departments. The sources available to me do not say who founded it, which patients it originally treated, or what its architecture looked like, so I cannot discuss those aspects with confidence.
The timeline is better documented. Construction started on 19 August 1952, and the building, which cost 1.35 billion markkaa (the Finnish currency of the time), opened on 16 May 1956. The official record gives 1991 as the founding date, yet the hospital had been treating patients since the mid-1950s.
Over the following decades its services were periodically reshaped. In 2013 it was announced that the cardiac surgery department would close and the number of beds would fall from 389 to 348. Later, a national healthcare reform proposed reducing the number of hospitals with full emergency services, and Vaasa was not on the preliminary list. Because the local population is nearly evenly divided between Finnish and Swedish speakers, the proposal sparked strong opposition: there was a large demonstration, the district's municipalities published a joint newspaper advertisement, and the matter reached Parliament. After a delay, on 1 January 2020 the hospital was officially granted the status of a comprehensive, 24-hour emergency hospital, reversing earlier plans.
During the COVID-19 pandemic, the first confirmed case in the Ostrobothnia region was recorded at the hospital on 12 March 2020, and in April a separate emergency area was set up for patients with respiratory symptoms. The hospital remains in operation and serves its district. For advanced stroke treatment, including mechanical thrombectomy (the removal of a clot using a catheter), it has an agreement with Norrland University Hospital in Umeå, Sweden, to which patients can be flown by air ambulance.
Key dates
- 1952: construction begins on 19 August.
- 1956: the hospital opens on 16 May.
- 2013: closure of cardiac surgery is announced, and beds are to fall from 389 to 348.
- 2020: on 1 January the hospital is granted comprehensive 24-hour emergency status.
- 2020: on 12 March the first COVID-19 case in the Ostrobothnia region is confirmed there.
- 2021: on 4 January voluntary vaccination of healthcare workers begins with the Pfizer-BioNTech vaccine.
Curiosities and anecdotes
A bilingual hospital
During the parliamentary debate, representatives argued that Vaasa was Finland's only fully bilingual hospital, with services in both Finnish and Swedish. This became the main argument for keeping its emergency status.
An agreement with Sweden
For stroke cases requiring thrombectomy, patients are not sent to the nearest Finnish university hospital but to Umeå, across the border, by air ambulance.